|
Compliance West TestLink Option
Click image to enlarge
Compliance West TestLink
|
The ultimate choice for both Ground Continuity(GF) and HIPOT (HT)testing.
The TESTLINK option combines the two units for one-button, simple operation. Logic level circuits and cables interconnect the two testers. A 60 second setup!
Once the GF and the HT are interconnected, simply plug the subject product into the HT receptacle and press the blue "TEST" button. First, the high current ground continuity (GF) test will be performed. In the event of failure a buzzer will sound and all subsequent tests will terminate. If the ground test passes, the dielectric withstand test will then begin. Test results are indicated by green (pass) or red (fail) lights.
Please note that both the GF and the HT can remain fully functional as individual units by disconnecting the TESTLINK cables.
|
| Model |
Description |
List Price |
Sale Price |
| TestLink |
Cables and Logic Level Circuits to connect Hi-Pot and GCT |
| $100.00 |  |
|
|