This reference is provided with high voltage receptacles and jumper cables to connect between the OUTPUT, RETURN, and MEASURING POINT receptacles of the Defib-5.
The MegaPulse Defib-5 Pass - Fail Reference is also available. This reference is provided with high voltage receptacles and jumper cables to connect between the OUTPUT, RETURN, and MEASURING POINT receptacles of the Defib-5 and simulates a borderline passing result (1 volt appearing on the Y1-Y2 jacks +/- 5%) for ensuring tester function before testing an EUT.

The graph above represents a properly functioning Defib-5, which was discharged into the Y1-Y2 measurement points of Table 50. (For a larger representation, click on the thumbnail above.) A functional check of the Defib-5 would be complete by using the Defib-5 Pass - Fail Reference as noted above; then conducting a second test by checking the output of Y1-Y2 with nothing connected to the Defib-5 Measuring Point, resulting in zero volts output, as shown in the graph below.

|